Fire Marshal Operational Permit

Operational permits are mandated by the 2021 International Fire Code, Section 105, as adopted by the City of Ennis.  These permits allow businesses to operate legally for a specified period, contingent on a properly completed application and required documentation.  Some permits require passing an inspection, and all applications must be submitted electronically through OpenGov using the link below.

Below is a list of Operational Permits and applicable fees.  To apply for an operational permit, please access the link below.  After accessing the link, please select 'Fire Department' and then 'Fire Marshal Operational Permit'.

https://ennistx.portal.opengov.com/

  
Operational Permit Fee   Operational Permit Fee
Additive Manufacturing $50.00   LP-Gas (Commercial only) $50.00
Aerosol Products $25.00   Lumber yards/wood Working Plants $50.00
Amusement building $100.00   Magnesium  $25.00
Aviation facility (per facility) $25.00   Miscellaneous combustible storage $25.00
Carnivals & fairs $75.00   Mobile Food Preparation Vendor $50.00
Cellulose Nitrate (Photo Development) $25.00   Motor Fuel dispensing facility.  $25.00
Combustible dust production operations  $100.00   Outdoor Burning Permit $75.00
Combustible fibers $100.00   Open Flames and Torches $25.00
Compressed gases $100.00   Open Flames and Candles $25.00
Covered mall buildings $25.00   Organic Coatings $75.00
Cryogenic Fluid $100.00   Outdoor Assembly Event $0.00
Cutting & Welding $50.00   Places of assembly  $75.00
Dry cleaning $25.00   Plant Extraction Systems $25.00
Energy Storage Systems $25.00   Private Fire Hydrants $50.00
Exhibit Halls / Trade Shows  $25.00   Pyrotechnic Special Effects Material $225.00
Explosives / Fireworks $225.00   Pyroxylin plastics $100.00
Flammable & combustible liquids  $100.00   Refrigeration equipment $25.00
Floor finishings $50.00   Repair garage  $25.00
Fruit & Crop Ripening $25.00   Rooftop heliports $25.00
Fumigation & thermal insecticidal fogging $25.00   Spraying & dipping $25.00
Hazardous material  $200.00   Storage of tires & tire by-products $50.00
High Pile Storage $100.00   Temporary Membrane Structures (Tents) $75.00
Hot Work Operations $50.00   Tire rebuilding plant $100.00
HPM facilities (hazardous portion material) $100.00   Waste handling $100.00
Industrial Ovens $25.00   Wood production $25.00
Liquid-or-gas-fueled vehicles or equipment in assembly  $25.00